{"id":278,"date":"2020-08-12T19:00:00","date_gmt":"2020-08-12T22:00:00","guid":{"rendered":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/"},"modified":"2020-08-12T19:00:00","modified_gmt":"2020-08-12T22:00:00","slug":"cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais","status":"publish","type":"post","link":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/","title":{"rendered":"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais"},"content":{"rendered":"\n<p>We are going to invest, R$ 6.2 billion until 2022, in improvements of distribution lines, substations and medium and low voltage grids. This amount will contribute to the economic and social development in the State, since it will be distributed throughout all regions of Minas Gerais.<\/p>\n\n\n\n<p>For 2020, nearly R$ 1.5 billion will be invested in the installation of new substations, and R$ 1.4 million in the protection, isolation and automation of distribution grids. This will result in more quality supply, with less oscillation and improved safety in the grids.<\/p>\n\n\n\n<p>By the end of the year, approximately 80 new power substations will be installed. The substations are the main sources to meet the new demands of all customer classes: residential, industrial, commercial and rural.<\/p>\n\n\n\n<p>The amount of R$ 1.4 million is foreseen for investment in protected and isolated grids and also for large-scale automation of distribution grids in Minas Gerais.<\/p>\n\n\n\n<p>There will be about 8,000 automatic devices installed. In case of defects in the electrical distribution grid, such as short-circuit overload, these equipment \u2013 known as automatic reclosers \u2013 perform several cycles of opening and closing up to normality of the electrical system\u201d, explains the Superintendent of Distribution Asset Management, \u201cHumberto Donisete de Faria\u201d.<\/p>\n\n\n\n<p>Together with the Government of Minas Gerais, we allocate these investments to different regions in the State and their economic and social development. Once again, with the commitment to contribute to life quality of people in Minas Gerais.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investiment-of-6-billion-in-energy-cemig-2.png\" alt=\"A person standing outdoors near large electrical transmission towers at sunset, with power lines stretching across the sky with text announcing an investment of R$ 6.2 billion in energy.\" class=\"wp-image-410\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We are going to invest, R$ 6.2 billion until 2022, in improvements of distribution lines, substations and medium and low voltage grids. This amount will contribute to the economic and social development in the State, since it will be distributed throughout all regions of Minas Gerais. For 2020, nearly R$ 1.5 billion will be invested in the installation of new substations, and R$ 1.4 million in the protection, isolation and automation of distribution grids. This will result in more quality supply, with less oscillation and improved safety in the grids. By the end of the year, approximately 80 new power substations will be installed. The substations are the main sources to meet the new demands of all customer classes: residential, industrial, commercial and rural. The amount of R$ 1.4 million is foreseen for investment in protected and isolated grids and also for large-scale automation of distribution grids in Minas Gerais. There will be about 8,000 automatic devices installed. In case of defects in the electrical distribution grid, such as short-circuit overload, these equipment \u2013 known as automatic reclosers \u2013 perform several cycles of opening and closing up to normality of the electrical system\u201d, explains the Superintendent of Distribution Asset Management, \u201cHumberto Donisete de Faria\u201d. Together with the Government of Minas Gerais, we allocate these investments to different regions in the State and their economic and social development. Once again, with the commitment to contribute to life quality of people in Minas Gerais.<\/p>\n","protected":false},"author":1,"featured_media":279,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-278","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sem-categoria"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais - Cemig en<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais - Cemig en\" \/>\n<meta property=\"og:description\" content=\"We are going to invest, R$ 6.2 billion until 2022, in improvements of distribution lines, substations and medium and low voltage grids. This amount will contribute to the economic and social development in the State, since it will be distributed throughout all regions of Minas Gerais. For 2020, nearly R$ 1.5 billion will be invested in the installation of new substations, and R$ 1.4 million in the protection, isolation and automation of distribution grids. This will result in more quality supply, with less oscillation and improved safety in the grids. By the end of the year, approximately 80 new power substations will be installed. The substations are the main sources to meet the new demands of all customer classes: residential, industrial, commercial and rural. The amount of R$ 1.4 million is foreseen for investment in protected and isolated grids and also for large-scale automation of distribution grids in Minas Gerais. There will be about 8,000 automatic devices installed. In case of defects in the electrical distribution grid, such as short-circuit overload, these equipment \u2013 known as automatic reclosers \u2013 perform several cycles of opening and closing up to normality of the electrical system\u201d, explains the Superintendent of Distribution Asset Management, \u201cHumberto Donisete de Faria\u201d. Together with the Government of Minas Gerais, we allocate these investments to different regions in the State and their economic and social development. Once again, with the commitment to contribute to life quality of people in Minas Gerais.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/\" \/>\n<meta property=\"og:site_name\" content=\"Cemig en\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-12T22:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png\" \/>\n\t<meta property=\"og:image:width\" content=\"520\" \/>\n\t<meta property=\"og:image:height\" content=\"316\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"suporte\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"suporte\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/\",\"url\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/\",\"name\":\"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais - Cemig en\",\"isPartOf\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png\",\"datePublished\":\"2020-08-12T22:00:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/#\/schema\/person\/c4b6d07c0f9e15959470023f0297d6a7\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#primaryimage\",\"url\":\"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png\",\"contentUrl\":\"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png\",\"width\":520,\"height\":316,\"caption\":\"A person standing outdoors near large electrical transmission towers at sunset, with power lines stretching across the sky.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/www.cemig.com.br\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/#website\",\"url\":\"https:\/\/www.cemig.com.br\/en\/\",\"name\":\"Cemig en\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cemig.com.br\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/#\/schema\/person\/c4b6d07c0f9e15959470023f0297d6a7\",\"name\":\"suporte\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ef8eb3be079494e88b0ab75401c949a7b7bd8346f41416b57fe050aee77a49ff?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ef8eb3be079494e88b0ab75401c949a7b7bd8346f41416b57fe050aee77a49ff?s=96&d=mm&r=g\",\"caption\":\"suporte\"},\"sameAs\":[\"https:\/\/www.cemig.com.br\"],\"url\":\"https:\/\/www.cemig.com.br\/en\/news\/author\/suporte\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais - Cemig en","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/","og_locale":"en_US","og_type":"article","og_title":"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais - Cemig en","og_description":"We are going to invest, R$ 6.2 billion until 2022, in improvements of distribution lines, substations and medium and low voltage grids. This amount will contribute to the economic and social development in the State, since it will be distributed throughout all regions of Minas Gerais. For 2020, nearly R$ 1.5 billion will be invested in the installation of new substations, and R$ 1.4 million in the protection, isolation and automation of distribution grids. This will result in more quality supply, with less oscillation and improved safety in the grids. By the end of the year, approximately 80 new power substations will be installed. The substations are the main sources to meet the new demands of all customer classes: residential, industrial, commercial and rural. The amount of R$ 1.4 million is foreseen for investment in protected and isolated grids and also for large-scale automation of distribution grids in Minas Gerais. There will be about 8,000 automatic devices installed. In case of defects in the electrical distribution grid, such as short-circuit overload, these equipment \u2013 known as automatic reclosers \u2013 perform several cycles of opening and closing up to normality of the electrical system\u201d, explains the Superintendent of Distribution Asset Management, \u201cHumberto Donisete de Faria\u201d. Together with the Government of Minas Gerais, we allocate these investments to different regions in the State and their economic and social development. Once again, with the commitment to contribute to life quality of people in Minas Gerais.","og_url":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/","og_site_name":"Cemig en","article_published_time":"2020-08-12T22:00:00+00:00","og_image":[{"width":520,"height":316,"url":"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png","type":"image\/png"}],"author":"suporte","twitter_card":"summary_large_image","twitter_misc":{"Written by":"suporte","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/","url":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/","name":"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais - Cemig en","isPartOf":{"@id":"https:\/\/www.cemig.com.br\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#primaryimage"},"image":{"@id":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png","datePublished":"2020-08-12T22:00:00+00:00","author":{"@id":"https:\/\/www.cemig.com.br\/en\/#\/schema\/person\/c4b6d07c0f9e15959470023f0297d6a7"},"breadcrumb":{"@id":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#primaryimage","url":"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png","contentUrl":"https:\/\/www.cemig.com.br\/en\/wp-content\/uploads\/sites\/2\/site\/\/2\/investing-6-billion-cover.png","width":520,"height":316,"caption":"A person standing outdoors near large electrical transmission towers at sunset, with power lines stretching across the sky."},{"@type":"BreadcrumbList","@id":"https:\/\/www.cemig.com.br\/en\/news\/cemig-invests-r-6-2-billion-in-improvements-to-the-electrical-system-in-minas-gerais\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.cemig.com.br\/en\/"},{"@type":"ListItem","position":2,"name":"Cemig invests R$ 6.2 billion in improvements to the electrical system in Minas Gerais"}]},{"@type":"WebSite","@id":"https:\/\/www.cemig.com.br\/en\/#website","url":"https:\/\/www.cemig.com.br\/en\/","name":"Cemig en","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cemig.com.br\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.cemig.com.br\/en\/#\/schema\/person\/c4b6d07c0f9e15959470023f0297d6a7","name":"suporte","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cemig.com.br\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ef8eb3be079494e88b0ab75401c949a7b7bd8346f41416b57fe050aee77a49ff?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef8eb3be079494e88b0ab75401c949a7b7bd8346f41416b57fe050aee77a49ff?s=96&d=mm&r=g","caption":"suporte"},"sameAs":["https:\/\/www.cemig.com.br"],"url":"https:\/\/www.cemig.com.br\/en\/news\/author\/suporte\/"}]}},"_links":{"self":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/posts\/278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/comments?post=278"}],"version-history":[{"count":0,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/posts\/278\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/media\/279"}],"wp:attachment":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/media?parent=278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/categories?post=278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/tags?post=278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}