{"id":207,"date":"2026-02-25T13:52:30","date_gmt":"2026-02-25T16:52:30","guid":{"rendered":"https:\/\/www.cemig.com.br\/en\/cemig-at-hospitals\/"},"modified":"2026-04-29T23:50:24","modified_gmt":"2026-04-30T02:50:24","slug":"cemig-at-hospitals","status":"publish","type":"page","link":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/","title":{"rendered":"Cemig at Hospitals"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\">Cemig at Hospitals<\/h1>\n\n\n\n<h2 class=\"wp-block-heading\">Action<\/h2>\n\n\n\n<p>Promote the replacement of light bulbs, tumble dryers, autoclaves (sterilization equipment) and surgical focus bulbs, in addition to implementing photovoltaic power generation systems, contributing to the&nbsp;<strong>reduction of energy consumption<\/strong>&nbsp;in health institutions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Public<\/h3>\n\n\n\n<p>Public and philanthropic hospitals<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Scope<\/h3>\n\n\n\n<p>80 institutions within Cemig\u2019s concession area.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Implementation<\/h3>\n\n\n\n<p>In progress.<\/p>\n\n\n\n<div style=\"height:48px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Action<\/h2>\n\n\n\n<p>Promoting a mix of energy interventions in hospital units located within Cemig\u00b4s concession area, in the State of Minas Gerais, through the replacement of inefficient equipment and the implementation of an Energy Management System. These energy efficiency interventions will be focused on lighting systems, sterilization of hospital materials, laundry equipment, surgical focus and generation systems distributed with photovoltaic panels.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">&nbsp;Public<\/h3>\n\n\n\n<p>Improvements should be prioritizing those hospitals whose interventions have the greatest impact on the cost-benefit ratio.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">&nbsp;Scope<\/h3>\n\n\n\n<p>The project also intends to support hospitals that are not in a regular commercial situation with Cemig. Hospitals that present such condition will be given alternatives for the settlement of their debts under special conditions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Implementation<\/h3>\n\n\n\n<p>In progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cemig at Hospitals Action Promote the replacement of light bulbs, tumble dryers, autoclaves (sterilization equipment) and surgical focus bulbs, in addition to implementing photovoltaic power generation systems, contributing to the&nbsp;reduction of energy consumption&nbsp;in health institutions. Public Public and philanthropic hospitals Scope 80 institutions within Cemig\u2019s concession area. Implementation In progress. Action Promoting a mix of energy interventions in hospital units located within Cemig\u00b4s concession area, in the State of Minas Gerais, through the replacement of inefficient equipment and the implementation of an Energy Management System. These energy efficiency interventions will be focused on lighting systems, sterilization of hospital materials, laundry equipment, surgical focus and generation systems distributed with photovoltaic panels. &nbsp;Public Improvements should be prioritizing those hospitals whose interventions have the greatest impact on the cost-benefit ratio. &nbsp;Scope The project also intends to support hospitals that are not in a regular commercial situation with Cemig. Hospitals that present such condition will be given alternatives for the settlement of their debts under special conditions. Implementation In progress.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":204,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"page-topicos.php","meta":{"_acf_changed":false,"footnotes":""},"tipo-de-conteudo":[20,21],"class_list":["post-207","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Cemig at Hospitals - Cemig en<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cemig at Hospitals - Cemig en\" \/>\n<meta property=\"og:description\" content=\"Cemig at Hospitals Action Promote the replacement of light bulbs, tumble dryers, autoclaves (sterilization equipment) and surgical focus bulbs, in addition to implementing photovoltaic power generation systems, contributing to the&nbsp;reduction of energy consumption&nbsp;in health institutions. Public Public and philanthropic hospitals Scope 80 institutions within Cemig\u2019s concession area. Implementation In progress. Action Promoting a mix of energy interventions in hospital units located within Cemig\u00b4s concession area, in the State of Minas Gerais, through the replacement of inefficient equipment and the implementation of an Energy Management System. These energy efficiency interventions will be focused on lighting systems, sterilization of hospital materials, laundry equipment, surgical focus and generation systems distributed with photovoltaic panels. &nbsp;Public Improvements should be prioritizing those hospitals whose interventions have the greatest impact on the cost-benefit ratio. &nbsp;Scope The project also intends to support hospitals that are not in a regular commercial situation with Cemig. Hospitals that present such condition will be given alternatives for the settlement of their debts under special conditions. Implementation In progress.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/\" \/>\n<meta property=\"og:site_name\" content=\"Cemig en\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T02:50:24+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/\",\"url\":\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/\",\"name\":\"Cemig at Hospitals - Cemig en\",\"isPartOf\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/#website\"},\"datePublished\":\"2026-02-25T16:52:30+00:00\",\"dateModified\":\"2026-04-30T02:50:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/www.cemig.com.br\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energy Efficiency\",\"item\":\"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cemig at Hospitals\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cemig.com.br\/en\/#website\",\"url\":\"https:\/\/www.cemig.com.br\/en\/\",\"name\":\"Cemig en\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cemig.com.br\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cemig at Hospitals - Cemig en","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/","og_locale":"en_US","og_type":"article","og_title":"Cemig at Hospitals - Cemig en","og_description":"Cemig at Hospitals Action Promote the replacement of light bulbs, tumble dryers, autoclaves (sterilization equipment) and surgical focus bulbs, in addition to implementing photovoltaic power generation systems, contributing to the&nbsp;reduction of energy consumption&nbsp;in health institutions. Public Public and philanthropic hospitals Scope 80 institutions within Cemig\u2019s concession area. Implementation In progress. Action Promoting a mix of energy interventions in hospital units located within Cemig\u00b4s concession area, in the State of Minas Gerais, through the replacement of inefficient equipment and the implementation of an Energy Management System. These energy efficiency interventions will be focused on lighting systems, sterilization of hospital materials, laundry equipment, surgical focus and generation systems distributed with photovoltaic panels. &nbsp;Public Improvements should be prioritizing those hospitals whose interventions have the greatest impact on the cost-benefit ratio. &nbsp;Scope The project also intends to support hospitals that are not in a regular commercial situation with Cemig. Hospitals that present such condition will be given alternatives for the settlement of their debts under special conditions. Implementation In progress.","og_url":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/","og_site_name":"Cemig en","article_modified_time":"2026-04-30T02:50:24+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/","url":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/","name":"Cemig at Hospitals - Cemig en","isPartOf":{"@id":"https:\/\/www.cemig.com.br\/en\/#website"},"datePublished":"2026-02-25T16:52:30+00:00","dateModified":"2026-04-30T02:50:24+00:00","breadcrumb":{"@id":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/cemig-at-hospitals\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.cemig.com.br\/en\/"},{"@type":"ListItem","position":2,"name":"Energy Efficiency","item":"https:\/\/www.cemig.com.br\/en\/energy-efficiency-program\/"},{"@type":"ListItem","position":3,"name":"Cemig at Hospitals"}]},{"@type":"WebSite","@id":"https:\/\/www.cemig.com.br\/en\/#website","url":"https:\/\/www.cemig.com.br\/en\/","name":"Cemig en","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cemig.com.br\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/pages\/207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/comments?post=207"}],"version-history":[{"count":1,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/pages\/207\/revisions"}],"predecessor-version":[{"id":423,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/pages\/207\/revisions\/423"}],"up":[{"embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/pages\/204"}],"wp:attachment":[{"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/media?parent=207"}],"wp:term":[{"taxonomy":"tipo-de-conteudo","embeddable":true,"href":"https:\/\/www.cemig.com.br\/en\/wp-json\/wp\/v2\/tipo-de-conteudo?post=207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}